LundHalsey and GCCD are proud to have delivered a state-of-the-art KVM-matrix-based control room to Equinor, a significant achievement that stands out among our most substantial projects.
This project involved a significant challenge in that installation had to be undertaken during live operations one cell at a time - each consisting of one console and one monitor wall - to ensure the continuous functioning of the crucial 24/7 365 operation.
Located in Hammerfest, Norway, the world's northernmost city with more than 10,000 inhabitants, this project exemplifies our commitment to excellence and seamless integration within demanding environments.
The power plant control room facility we developed features four operator stations, each equipped with bespoke curve designed LundHalsey KONTROL AIR height-adjustable control room operator consoles and height adjustable KUDOSTACKS monitor displays for optimal ergonomics and efficiency. To guarantee uninterrupted operation, each station has its own high-speed fibre matrix connected in a grid configuration for full redundancy. Careful planning and execution underscores our dedication to providing resilient and state-of-the-art technical furniture and modern control room design solutions for critical operations.